HGPP-16-A-G1 Festo Parallel gripper 

£852.26
PF187871 (187871)
Despatch Within 13 Working Days
Each
Order Quantity

* Price not including VAT
Price Info
Sales Prices
Each
£1,002.66  / Qty of 1+
Line Discounts:
EACH
15%  / Qty of   1+

About the Range

  • Festo Parallel gripper HGPP, Size 10, 12, 16, 20, 25, 32 mm
  • Stroke length 2 to 12.5 mm per gripper jaw
  • Force 40 to 415 N per gripper jaw
  • Position sensing.

Additional Information

Precise, for position sensing via hall effect sensor or inductive sensors. With gripping force retention when opening ...-G1.

Accessories
NEBU-M8G3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days
PUN-6x1-BL Festo Plastic tubing (50m Coil)
Despatch Within 7 Working Days
NEBU-M8W3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days
SMH-S1-HGPP16 Festo Position sensor
Despatch Within 7 Working Days
QSML-M5-6 Festo Push-in L-fitting (10 Pack)
Despatch Within 7 Working Days
HGPP-HWS-Q5-3 Festo Mounting kit
Despatch Within 7 Working Days
QSM-M5-6 Festo Push-in fitting (10 Pack)
Despatch Within 7 Working Days
Brand
Festo
Product Type
Festo Parallel gripper
Size
16
HGPP-HWS-Q5-3 Festo Mounting kit
Despatch Within 7 Working Days
SMH-S1-HGPP16 Festo Position sensor
Despatch Within 7 Working Days
NEBU-M8G3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days
PUN-6x1-BL Festo Plastic tubing (50m Coil)
Despatch Within 7 Working Days
QSM-M5-6 Festo Push-in fitting (10 Pack)
Despatch Within 7 Working Days
QSML-M5-6 Festo Push-in L-fitting (10 Pack)
Despatch Within 7 Working Days
NEBU-M8W3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days

What's Hot

SMH-S1-HGPP16 Festo Position sensor
Despatch Within 7 Working Days
HGPP-HWS-Q5-3 Festo Mounting kit
Despatch Within 7 Working Days
NEBU-M8G3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days
NEBU-M8W3-K-2.5-LE3 Festo Connecting cable
Despatch Within 7 Working Days
QSM-M5-6 Festo Push-in fitting (10 Pack)
Despatch Within 7 Working Days
QSML-M5-6 Festo Push-in L-fitting (10 Pack)
Despatch Within 7 Working Days
PUN-6x1-BL Festo Plastic tubing (50m Coil)
Despatch Within 7 Working Days

Recently Viewed

HGPP-16-A-G1 Festo Parallel gripper
Despatch Within 13 Working Days